Add missing 'n' in 'Testig'

master
Maximillian Schmidt 2 years ago
parent 4891677fdb
commit 8fe4bd1992

@ -27,12 +27,13 @@ This is a reminder that all OpenPOWER Foundation activities are subject to stric
2. **GPU specific images** 2. **GPU specific images**
* Created but need thorough testing. Manually installed GPU image is running great. Still need to test Lances auto-generated GPU image. * Created but need thorough testing. Manually installed GPU image is running great. Still need to test Lances auto-generated GPU image.


3. **AC922 Testig Status** The machines are ready for testing once the OPF Portal is integrated with OSU environment. 3. **AC922 Testing Status** The machines are ready for testing once the OPF Portal is integrated with OSU environment.


4. **OpenShift Entitlements** 4. **OpenShift Entitlements**
* OpenSHIFT entitlements are in Chris's account and good until 2023-06-29. * OpenSHIFT entitlements are in Chris's account and good until 2023-06-29.
* The OpenSHIFT auto installer is designed to use one private LAN and is therefore not compatible with the OSUOSL OpenStack Network Architecture. Max is adapting the installer. * The OpenSHIFT auto installer is designed to use one private LAN and is therefore not compatible with the OSUOSL OpenStack Network Architecture. Max is adapting the installer.
* We will give up redundancy and reliability in certain systems, so we can set up OpenSHIFT on Power ASAP. Systems can be offloaded onto redundant systems later. * We will give up redundancy and reliability in certain systems, so we can set up OpenSHIFT on Power ASAP. Systems can be offloaded onto redundant systems later.

5. **OFP Form and RT Integration - HIGH PRIORITY** 5. **OFP Form and RT Integration - HIGH PRIORITY**
* The OPF portal is still not ready to be integrated with OSU. Lance has some work to do to be able to integrate with OPF portal, and he expects he will be complete next week. * The OPF portal is still not ready to be integrated with OSU. Lance has some work to do to be able to integrate with OPF portal, and he expects he will be complete next week.
* This is the last major step needed to be able to promote the HUB to the PUBLIC and open it for general use. * This is the last major step needed to be able to promote the HUB to the PUBLIC and open it for general use.

Loading…
Cancel
Save