You cannot select more than 25 topics Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
openpower.foundation_sw_dev/content/blog/reflections-on-migrating-ib...

29 lines
2.1 KiB
Markdown

This file contains invisible Unicode characters!

This file contains invisible Unicode characters that may be processed differently from what appears below. If your use case is intentional and legitimate, you can safely ignore this warning. Use the Escape button to reveal hidden characters.

This file contains ambiguous Unicode characters that may be confused with others in your current locale. If your use case is intentional and legitimate, you can safely ignore this warning. Use the Escape button to highlight these characters.

---
title: "Reflections on Migrating IBM APP Genomic Workflow Acceleration to IBM POWER8"
date: "2015-01-16"
categories:
- "blogs"
---
**Author:** [Chandler Wilkerson](https://www.linkedin.com/profile/view?id=13493892&authType=NAME_SEARCH&authToken=jXYu&locale=en_US&srchid=32272301421439110454&srchindex=1&srchtotal=2&trk=vsrp_people_res_name&trkInfo=VSRPsearchId%3A32272301421439110454%2CVSRPtargetId%3A13493892%2CVSRPcmpt%3Aprimary), Rice University
### Objective
To describe the challenges and lessons learned while installing the IBM Power Ready Platform for Genomic Workflow Acceleration on new IBM POWER8 hardware.
### Abstract
Migrating any workflow to a new hardware platform generates challenges and requires adaptability. With the transition from POWER7 to POWER8, the addition of PowerKVM obviates the need for VIOS and provides the opportunity to manage virtual machines on the POWER platform in a much more Linux-friendly manner. In addition, a number of changes to Red Hats Enterprise Linux operating system between versions 6 and 7 (7 being required for full POWER8 support at the time of this projects start) have required modifying the standard processes outlined in the tested IBM solution. This presentation will take attendees through the growing pains and lessons learned while migrating a complex system to a new platform.
### Bio
Chandler has taken the lead on all IBM POWER related projects within Rices Research Computing Support Group since 2008, including a pre-GA deployment of POWER7 servers that turned into a 48-node cluster, Blue BioU. The RCSG team maintains a collection of different HPC resources purchased through various grants, and is experienced in providing as uniform a user experience between platforms as possible.
### Presentation
<iframe src="https://openpowerfoundation.org/wp-content/uploads/2015/03/Wilkerson-Chandler_OPFS2015_RiceUniversity_031115_final.pdf" width="100%" height="450" frameborder="0"></iframe>
[Download Presentation](https://openpowerfoundation.org/wp-content/uploads/2015/03/Wilkerson-Chandler_OPFS2015_RiceUniversity_031115_final.pdf)
[Back to Summit Details](javascript:history.back())